CASE STUDIES

Proven solutions for complex challenges

We take pride in delivering exceptional results for all of our clients. To understand the full extent of our capabilities, take a look at some of the diverse projects we have recently been involved in.

Cost-effective High Quality Picks

Cost-effective High Quality Picks

Castech Solutions trials robust low-cost picks for trenching. Castech Solutions is the Australian agent for a manufacturer of mining and construction cutting solutions. The catalog of this manufacturer comprises consumable parts including mining and construction Picks...

read more
Reverse Engineer Bogie Frame

Reverse Engineer Bogie Frame

Client V/Line / Bombardier Transportation Challenge Castech was tasked to reverse engineer, improve and manufacture the client’s bogie frame. With no existing drawings or specifications to review or analyse, we were required to work with the original frame to...

read more
Rock Box Liners Redesign

Rock Box Liners Redesign

Client Uranium ore processing plant Challenge A uranium processing plant was experiencing premature failure of OEM Bisalloy 400 liners in the mill feed chute causing production delays. Castech Solution was tasked to increase the life of the liners in the rock box...

read more
Conversion Of A Fabricated Rocker Arm To A Casting

Conversion Of A Fabricated Rocker Arm To A Casting

Client Agricultural equipment manufacturer Challenge Seeking to improve product competitiveness and performance, a manufacturer asked Castech Solutions to assist with a complete design review of their components. Many components had originally been designed as...

read more